Hi everyone, I'm considering two deck upgrades this year and was wondering if anyone can share insight on proper location and fit-up...
#1. Double-ended spinnaker pole downhaul. Seems pretty simple from a hardware perspective (a few additional blocks, cam cleats, etc.) but I can't decide the best way to run the line; should it run on the top of the cabin or along the side of the cabin. Any experience?
#2. Double-ended vang control line. I need the replace the blocks on the vang, I was thinking of going ahead with a double-ended setup and bring the control lines to each side of the cabin top Like this Harken layout (the current arrangement has the line exiting at the boom near the top of the vang and can be difficult to reach when you need to...) Again, any insight or picture of existing installations...
Thanks in advance, Guy